HVAC MCC’s for OIL & GAS

CUBIC Partner Masseera has successfully integrated HVAC MCC’s for GASCO projects. The project constituted the integration of Motor Control Centers for Heating, ventilation and air-conditioning for projects: ASAB-0 & Ruwais Sulphur Handling Project – 2 (RSHT-2) for Abu Dhabi Gas Industries Limited (GASCO) in Abu Dhabi, United Arab Emirates.

The critical criterion on both the projects was to design, integrate, test and supply on a very urgent basis; type tested, form 4, drawout MCC’s in full compliance to GASCO DGS 1630 023, Rev-1 and the requirements of internal arc fault test in accordance to IEC TR 61641:2008.

   

CUBIC along with their regional partner in United Arab Emirates; M/S Masseera Industrial Switchgear FZE were able to succesfully comply to the project Requirements.

The flexibility in using CUBIC’s modular type switchgear really helped the cause in designing and integrating the MCC’s in record time and also in overcoming the challenges involved in fitting the MCC’s within the site space constraints.

Furthermore, this flexibility was also tested and proven when it was required that additional feeders & starter compartments had to be added on to the MCC’s that were already designed, assembled, factory tested and suplied.